Commercial Kitchen Flooring Systems
Fryer spills, nightly degreaser washdown, walk-in freezer cycles, and a dining room that reopens at 11 AM sharp. Maverick builds the seamless urethane cement kitchen floors that replace failed quarry tile for good.
Every Zone Fails Floors Differently
A kitchen punishes every square foot differently. We zone the build, slope it to the drains, cove it up the walls, and hand it back before service.
Cook Line & Fry Stations
Hot oil, 350°F fryer spills, and steam. MavCrete UM at ¼″ absorbs the thermal shock that delaminates thin floors and cracks tile.
Dish Pits & Pot Wash
Scalding water and detergent around the clock. MavCrete UQ-HD quartz texture keeps crews on their feet on a permanently wet floor.
Walk-In Coolers & Freezers
Defrost cycles and door-line condensation. Urethane cement tracks the slab through every temperature swing.
Prep & Servery
Cleanable, slip-balanced texture where staff pivot between stations all shift.
Drains, Coves & Transitions
Slope-to-drain rebuilds with MavGrout USP, integral cove base up every wall, and honored joints — the details that decide health inspections.
Back Dock & Waste
Grease bins, hose-down, and cart traffic — the zone everyone forgets and every floor fails first.
The Systems This Industry Specifies
MavCrete Cementitious Urethane
The kitchen system — thermal shock rated, washdown proof, coved and sloped. UM mortar with UF-HD flake and UQ-HD quartz finishes.
Explore the SystemFast-Cure Systems
Closed at midnight, serving at eleven — rapid-cure builds for kitchens that cannot stay dark.
Explore the SystemMavJoint Fillers & Sealants
Every joint honored — marked, saw-cut through the installed system, backer rod set, and filled with flexible joint sealant.
Explore the SystemOver Failed Tile, Before and After
Photographed by our crew on the way in and on the way out.
Seamless broadcast system installed directly over existing tile — washrooms, halls, and wet areas
Specify It Once, Correctly
The Architect Center carries the full standard detail library — integral cove bases, drain transitions, terminations, and joint treatments — plus isometric system shop drawings and CSI 3-part specifications under Section 09 67 23 Resinous Flooring.
Planning a Floor?
Shutdown windows, phased occupancy, audit deadlines — bring us the constraint and we will engineer the floor around it.