Chemical Facility Flooring Systems
Acids, caustics, solvents, and the containment regulations that come with them. Maverick builds chemically resistant floors and secondary containment that hold what the process side spills — indoors and out.
Where Chemistry Meets Concrete
Chemical exposure is not one condition — concentration, temperature, and dwell time decide the system. We match resin chemistry to your exposure schedule, zone by zone.
Secondary Containment
Troweled mortar and membrane systems lining containment areas, sumps, and berms — engineered for the stored chemistry and inspection regime.
Process Floors
¼″ troweled mortar systems standing up to spills, washdown, and mechanical abuse between turnarounds.
Pump Pads & Equipment Bases
Rebuilt, sloped, and coated — including positive-side waterproofing where pads sit over occupied or sensitive space.
Trenches & Sumps
Lined and detailed to drain — the corners and terminations are where containment fails, so that is where our detailing starts.
Tank Farms
Exterior-rated builds tolerating thermal cycling, UV, and the forklift traffic that services the tanks.
Loading & Transfer Areas
Impact- and abrasion-resistant surfaces where drums, totes, and trucks move all shift.
The Systems This Work Demands
MavClad EM Epoxy Mortar
¼″ troweled, chemically resistant — the heavy-duty body for process floors.
Explore the SystemMavCrete Urethane Cement
Thermal shock and organic acid service — washdown-rated mortar systems.
Explore the SystemRepair & Slope Restoration
MavPatch, MavRapidPatch, and MavGrout USP — the substrate rebuilt before the system goes down.
Explore the SystemContainment Work, Photographed On Site
Our crew rebuilding and lining secondary containment in an operating chemical plant — prep, repair, and system installation around live process equipment.
Secondary containment — rebuilt and lined around live process equipment
Specify It Once, Correctly
The Architect Center carries the full standard detail library, isometric system shop drawings, and CSI 3-part specifications under Section 09 67 23 Resinous Flooring.
Planning This Work?
Shutdown windows, phasing, occupied facilities — bring us the constraint and we will engineer the floor around it.