Engineered, manufactured, and installed by one company Specifier ResourcesCall (313) 889-2526

Commercial Kitchen Flooring Systems

Fryer spills, nightly degreaser washdown, walk-in freezer cycles, and a dining room that reopens at 11 AM sharp. Maverick builds the seamless urethane cement kitchen floors that replace failed quarry tile for good.

Replaces Failed Quarry Tile Thermal Shock Rated Overnight Turnarounds

Every Zone Fails Floors Differently

A kitchen punishes every square foot differently. We zone the build, slope it to the drains, cove it up the walls, and hand it back before service.

Commercial kitchen flooring is typically seamless cementitious urethane — MavCrete UM installed at ¼″ in place of failed quarry tile — because cook lines take hot fryer oil, steam, and thermal cycling through 250°F washdown while dish pits run scalding water and detergent around the clock. Floors are sloped to drain, coved up the walls, and handed back before service.

Cook Line & Fry Stations

Hot fryer oil and steam — thermal shock rated through 250°F washdown. MavCrete UM at ¼″ absorbs the thermal cycling that delaminates thin floors and cracks tile.

Dish Pits & Pot Wash

Scalding water and detergent around the clock. MavTop UQ-HD quartz texture keeps crews on their feet on a permanently wet floor.

Walk-In Coolers & Freezers

Defrost cycles and door-line condensation. Urethane cement tracks the slab through every temperature swing.

Prep & Servery

Cleanable, slip-balanced texture where staff pivot between stations all shift.

Drains, Coves & Transitions

Slope-to-drain rebuilds with MavGrout USP, integral cove base up every wall, and honored joints — the details that decide health inspections.

Back Dock & Waste

Grease bins, hose-down, and cart traffic — the zone everyone forgets and every floor fails first.

Commercial kitchen flooring by zone
ZonePrimary ExposureTypical Starting PointNominal Thickness
Cook Line & Fry Stations Hot fryer oil, steam, and 250°F washdown MavCrete UM ¼″
Dish Pits & Pot Wash Scalding water and detergent around the clock MavTop UQ-HD quartz —
Walk-In Coolers & Freezers Defrost cycles and door-line condensation Urethane cement (MavCrete) —
Prep & Servery Staff pivoting between stations all shift Cleanable, slip-balanced texture —
Drains, Coves & Transitions Health-inspection detail points MavGrout USP slope-to-drain rebuilds with integral cove base —
Back Dock & Waste Grease bins, hose-down, and cart traffic Zoned within the kitchen build —

Starting points, not prescriptions. Every Maverick system is engineered to the condition of the substrate, the abuse it takes, and the facility’s history with previous floors — the build changes from room to room and plant to plant. Only new construction over bare concrete comes close to a standard build.

Over Failed Tile, Before and After

Photographed by our crew on the way in and on the way out.

Washroom and hallway floors before and after: seamless flake broadcast system installed over existing tile

Seamless broadcast system installed directly over existing tile — washrooms, halls, and wet areas

Specify It Once, Correctly

The Architect Center carries the full standard detail library — integral cove bases, drain transitions, terminations, and joint treatments — plus isometric system shop drawings and CSI 3-part specifications under Section 09 67 23 Resinous Flooring.

Real Maverick Work

Maverick crews installing Maverick-manufactured systems. Captions describe what is visible in each frame.

Commercial kitchen renovation in progress: old floor removed, substrate measured and prepared, then a new seamless floor poured with integral cove base and drains

Kitchen renovation, demolition through pour: substrate prep, drain and cove detailing, and the new seamless floor going down

Commercial kitchen renovation: stripped substrate before, and the finished seamless floor with cove base, trench drain and equipment edges after

Kitchen renovation finished: seamless floor, cove base and drain details after a full substrate rebuild

Commercial kitchen: failing quarry tile with grout loss and patches removed and replaced with a red seamless floor and integral cove base, before and after

Quarry tile to seamless: worn tile and grout replaced with a red seamless kitchen floor and cove base

Planning a Floor?

Shutdown windows, phased occupancy, audit deadlines — bring us the constraint and we will engineer the floor around it.