University & Campus Flooring Systems
A campus is every facility type at once: labs, vivariums, dining, locker rooms, mechanical plants, and parking — on a schedule that only works between semesters. Maverick covers all of it with one accountable team.
One Campus, Every Floor Condition
Facilities teams juggle decades-old buildings and brand-new science centers. We phase the work around the academic calendar and bring the same engineering to every building type.
Research Labs & Vivariums
Seamless, coved, chemical-resistant floors that pass accreditation — including full vivarium and cagewash builds.
Dining & Food Service
Urethane cement in the kitchens, decorative broadcast in the servery — the same systems we install in commercial food plants.
Locker Rooms & Aquatics
Over-tile installs and waterproof broadcast systems for the wettest buildings on campus.
Mechanical Plants
Coated equipment-room floors with demarcation and positive-side waterproofing over occupied space.
Stadium & Athletics Support
Concourses, training rooms, and equipment areas — durable, cleanable, branded with school colors.
Residence Halls
Bathrooms, kitchens, and common areas rebuilt over breaks — phased so buildings reopen on time.
The Systems This Work Demands
MavCoat Epoxy
Labs, corridors, and athletics — the broadest system family on campus.
Explore the SystemMavCrete Urethane Cement
Dining halls and washdown kitchens, built to food-plant standards.
Explore the SystemRepair & Restoration
Decades-old slabs rebuilt — patching, slope correction, and joint restoration before the new floor.
Explore the SystemCampus Work, Photographed On Site
A university vivarium corridor by our crew — seamless flake broadcast with integral cove base, installed to the accreditation standard.
University research facility — seamless broadcast corridor with integral cove
Specify It Once, Correctly
The Architect Center carries the full standard detail library, isometric system shop drawings, and CSI 3-part specifications under Section 09 67 23 Resinous Flooring.
Planning This Work?
Shutdown windows, phasing, occupied facilities — bring us the constraint and we will engineer the floor around it.