Epoxy & Industrial Flooring Contractor — Canton, Michigan
Maverick Performance Solutions is an industrial resinous flooring manufacturer, contractor, and supplier serving Canton, Michigan — a straight run down I-275 from our Farmington Hills plant. We engineer, manufacture, and install epoxy, urethane cement, epoxy mortar, and concrete repair systems for Canton's distribution buildings, food service back-of-house, and light manufacturing space.
Built for the I-275 Corridor
Canton is a freight township with a main street. The I-275 interchanges along the township's main east–west arteries put cross-docks and logistics floors minutes from the expressway, while the Haggerty corridor fills in with machine shops and flex bays that change tenants every few years. Between them sits one of western Wayne County's densest restaurant back-of-house populations.
All three sit in our home market. Canton is a short highway run from our Farmington Hills headquarters and manufacturing facility, so assessments are scheduled within days and crews and factory-batched material mobilize from our own shop — no distributor standing between your shutdown date and our production calendar.
What Canton Facilities Get
- Assessments on your slab. Moisture, existing coatings, joint condition, and wheel traffic measured before a product is named.
- A response within 48 hours. An engineered build-up recommendation and budget direction inside two days — our standing promise.
- Shutdown-window scheduling. Weekend, overnight, and holiday installs phased around shipping and service hours.
- A 2-year single-source warranty. Materials and labor under one signature.
The Systems Canton's Buildings Actually Need
Eight engineered system platforms, built from nine Mav product families and 26 products. Below are the builds Canton calls for most — each manufactured and installed by Maverick, every quantitative claim traced to its technical data sheet.
Distribution & Logistics Floors
Forklift-rated epoxy bodies, rebuilt joint shoulders, and coated-in aisle demarcation for the cross-docks and 3PL buildings off I-275 — installed in phases so freight keeps moving.
Warehouse Floor CoatingsLight Manufacturing & Flex Bays
MavCoat 100% solids epoxy — self-leveling, high-build, and broadcast builds — from a nominal 16–30 mils for production and warehouse traffic up to ¼″ MavClad EM epoxy mortar where impact and chemistry are worst.
Epoxy Flooring ContractorCommercial Kitchen Flooring
Seamless, coved MavCrete floors replacing failing quarry tile in Canton's restaurant, grocery, and catering back-of-house — sloped to drain, slip-textured by zone, installed overnight so doors open on time.
Commercial Kitchen FlooringUrethane Cement
MavCrete UM cementitious urethane rated for thermal shock through 250°F washdown — the system for food production, wash bays, and the wettest, hottest rooms in any Canton facility.
Urethane Cement FlooringConcrete Floor Repair
Spalled dock aprons, blown joint shoulders, bolt holes from the last tenant's racking, and worn slabs rebuilt with MavRapidPatch and MavJoint materials — many repairs back in service the same shift.
Concrete Floor RepairShowroom & Front-of-House
Showroom-grade MavCoat Metallic finishes for Canton's retail build-outs, dealership floors, and dining rooms — decorative depth over an industrial-duty body, phased around fit-out schedules.
Metallic Epoxy FlooringSpecifying rather than buying? Build-ups and typical properties live on the MavCoat epoxy, MavCrete urethane cement, MavClad troweled mortar, and MavTop broadcast pages, or build layer-by-layer in the System Builder.
What Manufacturer-Direct Means for Your Schedule
Most flooring bids in Canton are a subcontract: a local applicator, somebody else's resin, and a warranty living in the gap between them. When material ships late the applicator blames the manufacturer; when the floor fails the manufacturer blames the applicator. Maverick removes the gap.
- Material on our production calendar. Factory-batched, matched kits made in Farmington Hills — no waiting on a distributor's allocation.
- One accountable party. A 2-year single-source warranty covering materials and labor.
- The spec is the install document. The build-up you approve is what our installers work against.
- Supplier when you self-perform. The same engineered materials sold direct, with the build-up written out.
Canton and the Rest of the Map
Canton sits inside our home market, minutes from the I-275 corridor. See the Metro Detroit page for the wider coverage picture, or the service areas hub for everywhere Maverick works.
Canton Questions, Answered Straight
How fast can you be on site in Canton?
Canton is a straight run down I-275 from our Farmington Hills headquarters and manufacturing facility, so site assessments are typically scheduled within days. Every scope request comes back with an engineered build-up recommendation and budget direction within 48 hours — that's our standing promise. Call (313) 889-2526 if you're working against a fixed shutdown window.
Can you coat a Canton distribution floor without stopping shipments?
Yes — phasing is standard practice here, not a special request. Distribution floors are sequenced aisle-by-aisle or bay-by-bay so racking stays loaded and trucks keep hitting their windows, and weekend, overnight, and holiday work is engineered into the crew plan before anyone mobilizes.
What flooring works in a Canton restaurant kitchen or food production room?
MavCrete urethane cement. It installs seamless, coved up the walls, sloped to drain, and slip-textured by zone, and it is rated for thermal shock through 250°F washdown. MavCrete is formulated to support food-safety compliance programs, and it goes in overnight so the line opens on schedule.
Do you handle Canton's flex buildings and light manufacturing bays?
We do. Flex space changes tenants and changes duty cycles, so every bay gets scoped for what it will actually see — wheel traffic, dropped tooling, coolants, or chemical exposure. Assemblies run from MavCoat epoxy at a nominal 16 to 30 mils up to quarter-inch MavClad EM epoxy mortar.
Scope Your Canton Floor
Distribution building, kitchen back-of-house, or a flex bay you just signed — send square footage, traffic, and exposure. An engineered build-up recommendation and budget direction come back within 48 hours.