Engineered, manufactured, and installed by one company Specifier ResourcesCall (313) 889-2526
MavTop · Epoxy Flake Broadcast

MavTop EFB Epoxy Chip Broadcast System

MavTop EFB is a versatile, double-broadcast floor system that utilizes Maverick Decorative Chip to achieve easy to maintain, long-lasting results. This four-layer system offers 12 standard blends. The featured system has a gloss finish, but optional satin and non-skid texture is available.

MavTop EFB: Epoxy Chip Broadcast System

MavTop EFB consists of a primer, two 1/4" vinyl chip broadcast layers and a topcoat. The defined system will produce the same properties as MavTop EFB with increased thickness for areas that have this need.

The primer is MavCoat or any Maverick clear epoxy primer. Each broadcast layer is a 100% solids self-leveling epoxy with Decorative Chip broadcast into the wet coating; the first coat is pigmented with MavTints to a color similar to the chip blend, and the second coat is applied clear and thicker. The system is locked in with MavSeal UPA Slow Cure, which is also available in medium and fast cure speeds. Other Maverick products may be used as alternative parts of this system.

Where it fits: MavTop EFB is a complete four-layer floor system: a clear Maverick epoxy primer over CSP 3+ concrete, two 100% solids self-leveling epoxy coats each broadcast with Decorative Chip, and a MavSeal UPA Slow Cure topcoat.

Every figure on this page is taken from the MavTop EFB system guide. Open the system guide for the complete application instructions.

MavTop EFB Layer Stack

As drawn in the MavTop EFB system guide, topcoat first. Thicknesses and rates are nominal; the system guide governs.

LayerMaterialNominal
TopcoatMavSeal UPA Slow Cure10 – 16 mils wet, 100 – 160 sq. ft./gal.
2nd broadcast coat100% solids self-leveling epoxy, clear, with Decorative Chip broadcast12 – 16 mils; chip at 6 sq. ft./lb.
1st broadcast coat100% solids self-leveling epoxy, pigmented, with Decorative Chip broadcast8 – 12 mils; chip at 6 sq. ft./lb.
PrimerMavCoat or any Maverick epoxy primer, clear3 – 8 mils, 200 – 533 sq. ft./gal.
Prepared substrateConcreteCSP 3+

Read Before Specifying

  • Do not apply at temperatures or thicknesses not recommended
  • Do not delay in pouring mixed material onto the floor
  • Do not make partial mixes
  • Do not invert epoxy pails to drain
  • Do not apply over loose or unsound concrete, asphalt or bitumen substrates, glazed tile or nonporous brick and tile, magnesite, copper, metal, polyesters, or elastomeric membranes
  • Moving joints and shrinkage cracks may reflect through the system; joints that are designed to move may reflect through the finished flooring system if they are not honored
  • Tire marking may occur

MavTop EFB Published Data

Values below are reproduced from the current MavTop EFB system guide dated 10/10/2026. Request project-specific values through the data sheet.

MavTop EFB physical data, as published
PropertyValue
System FinishGloss (optional satin and non-skid texture available)
Standard Blends12
Prepared SubstrateCSP 3+
Decorative Chip40 lb. Box, Variety of Blends
Air Temperature60° – 85°F (16° – 29°C)
Surface Temperature60° – 85°F (16° – 29°C)
Material Temperature60° – 85°F (16° – 29°C)
MavTop EFB physical properties and test methods
PropertyTest MethodResult
Adhesion to ConcreteASTM D7234> 400 PSI (100% Concrete Failure)
Coefficient of Friction (Wet DCOF)ANSI A326.3.55
Compressive StrengthASTM D69511,600 psi
ElongationASTM D23705 – 10%
FlammabilitySelf-Extinguishing on Concrete
Flexibility 1/8" MandrelASTM D522Passes/No Cracking
Flexural StrengthASTM D79012,800 psi
Hardness, Shore D (24 hours, 5 days)ASTM D204070, 86
Taber Abrasion (CS-17 Wheel, 1000 mg. Load, 1000 Cycles)ASTM D406030 mg Loss
Tensile StrengthASTM D6389,600 psi
Gloss @ 60 AngleASTM D52392 – 95
UV Resistance (gloss after 1000 hours in QUV)ASTM G15487 – 89
VOCEPA Method 24< 50 g/L
  • Theoretical coverage: MavCoat 100% solids epoxy primer: 3 – 8 mils wet and dry, 200 – 533 sq. ft./gal. 100% solids self-leveling epoxy, 1st broadcast coat: 8 – 12 mils, 134 – 200 sq. ft./gal. 100% solids self-leveling epoxy, 2nd broadcast coat: 12 – 16 mils, 100 – 133 sq. ft./gal. Decorative Chip: 6 sq. ft./lb. or 240 sq. ft. per 40 lb. box. MavSeal UPA Slow Cure: 10 – 16 mils wet, 9 – 14 mils dry, 100 – 160 sq. ft./gal.
  • Packaging: MavCoat 100% solids epoxy primer, 1.5-Gallon Kit (Clear / Gloss). 100% solids self-leveling epoxy, 2-Gallon (1st broadcast coat) and 1-Gallon (2nd broadcast coat), Clear / Gloss. Decorative Chip, 40 lb. Box. MavSeal UPA Slow Cure, 2-Gallon Kit (Clear / Gloss); MavSeal UPA Part-A Slow Cure and Part-B also available in 5-Gallon.
  • Colors and finish: Gloss finish standard, with optional satin and non-skid texture. Decorative Chip is offered in 12 standard blends. 3 gallons of the clear self-leveling epoxy can be pigmented with 1 pint of MavTints in Haze Gray, Light Gray, Deck Gray, Sandstone, White, Black and Tile Red (2 pints White and Sandstone can be used to improve hide).
  • Shelf life and storage: 12 months from date of manufacture when stored indoors in the original unopened container at 60°F – 85°F (16°C – 29°C) in a dry location with humidity below 65%. Do not allow materials to freeze.

Substrate Requirements

Concrete and coated concrete surfaces must be sound, clean, dry, and free of contaminants such as loose coatings, dirt, dust, grease, oil, silicone, and other contaminants that may negatively affect adhesion. A suitable moisture barrier must be in place for slabs on-grade; the MVT rate must not exceed three pounds per 1,000 square feet per 24 hours per ASTM F1869 and slab relative humidity must not exceed 75% per ASTM F2170, otherwise MavCoat MVB moisture vapor barrier primer may be required. New or bare concrete must be cured a minimum of 28 days and diamond ground or shotblasted to a CSP-3 or greater profile (SSPC-SP13 / NACE 6 or ICRI Guideline No. 310.2). Previously coated surfaces are cleaned, then thoroughly ground with 30 grit metal diamonds to remove any grout or non-epoxy topcoats and provide the required profile. Cracks, holes and spalled areas are patched with MavPatch Epoxy or a Maverick 100% solids epoxy thickened with fumed silica, scraped flush. Perimeter terminations are taped, and termination points at drains, dock plates and high-traffic impact points are sawcut and keyed in. Isolation, expansion and movable joints are honored after installation; contraction (sawcut) joints may be filled and coated over, though they may crack over time with slab movement.

Mixing and Installation

The MavCoat primer is mixed 2 parts Part-A to 1 part Part-B by volume, poured in a bead and spread at 3 – 8 mils with a flat squeegee or spring blade wearing spiked shoes, overlapping passes to fill pinholes; a tight, thin coat with no back-roll best minimizes outgassing bubbles. Once the primer has dried, the first 100% solids self-leveling epoxy coat (2:1 by volume, pigmented with 1 pint MavTints per 3 gallons to a color similar to the chip blend) is spread at 8 – 12 mils with a 1/8" notched squeegee, back-rolled with a non-shed 3/8" roller, allowed 10 – 15 minutes to level, and broadcast with Decorative Chip at 6 sq. ft. per lb. (240 sq. ft. per 40 lb. box) while keeping a wet edge and never letting chip pile on the floor. After it dries, excess chip is vacuumed and loose chip gently scraped off, then the second coat is applied the same way but unpigmented at 12 – 16 mils and broadcast again. The MavSeal UPA Slow Cure topcoat is mixed 1:1 by volume in full kits only and applied by flat or notched EPDM squeegee at 100 – 160 sq. ft. per gal. (10 – 16 mils wet) and back-rolled, or dip-and-rolled with an 18" roller in hot or humid conditions; keep mix-to-mix tie-ins within 5 – 10 minutes and use joints as natural breaks. If less texture is desired, a second coat of 6 – 8 mils (no more than 200 sq. ft. per gal.) may be applied within 24 hours. Applying thicker than recommended, pooling or late rolling may leave a white, hazy appearance. Do not mix more material than can be applied in 10 – 15 minutes; air, surface and material should be 60° – 85°F and the floor at least 5 degrees above the dew point.

Full step-by-step instructions, pot life and recoat windows are in the MavTop EFB system guide. Maverick installs MavTop EFB with its own crews.

Specifying MavTop EFB?

Maverick engineers, manufactures and installs the system. Send the drawings and we will return a scope, a build-up and a quote.