Mid-Michigan · Manufacturer · Installer

Industrial & Epoxy Flooring Contractor — Lansing, Michigan

Maverick engineers, manufactures, and installs resinous flooring for Lansing's food processors, manufacturers, and state and campus facilities. We are not a Lansing branch and do not pretend to be one — our plant and our crews are in Farmington Hills, and they travel to mid-Michigan together. Every scope request gets an engineered recommendation within 48 hours, wherever the floor is.

The Systems Mid-Michigan Floors Actually Need

Greater Lansing is three floor problems in one market. Food and beverage processors run wet, hot, and chemically aggressive — their slabs fail at the drains, the coves, and the quarry tile grout. Manufacturers, metal fabricators, and plastics shops fail differently: forklift traffic, dropped tooling, cutting fluids, and joint shoulders that spall until the wheels start pounding. State building stock and campus facilities bring a third set — fleet garages, central plants, dining halls, and research labs, all occupied, all on hard calendars. Each gets a different engineered answer from the same catalog.

Specifying rather than buying? Build-ups and cross-sections live on the MavCoat epoxy, MavCrete urethane cement, MavTop broadcast, and MavClad mortar pages, or assemble a build in the System Builder.

The Material Is Made in Farmington Hills and Travels With the Crew

Most flooring bids that land on a Lansing desk are a subcontract stack: someone else's resin, a local applicator hired for the week, and a warranty that lives in the gap between them. Maverick works the other way. We manufacture what we install, so the spec, the batch, and the crew on your slab all answer to one company. Distance changes the logistics. It does not change the specification or who is responsible.

  • One accountable party. We design the system, manufacture it, install it with our own crews, and back it with a 2-year single-source warranty covering materials and labor.
  • Factory-batched material travels in. Systems are manufactured in Farmington Hills and shipped as matched kits, quantified off the approved build-up — not sourced locally on the fly.
  • Crews that stage in. Our installers mobilize to mid-Michigan for the duration rather than commuting daily, which is why fixed shutdown windows suit these projects.
  • A response within 48 hours. Scope requests come back with an engineered build-up recommendation and budget direction — the same promise Lansing gets as anywhere else.

Lansing Industries on Maverick Floors

Mid-Michigan mixes food processing, manufacturing, state government building stock, and a major campus in a way few markets do — and each of them fails a floor for its own reasons.

Lansing and the Surrounding Communities

Lansing is a travel market for us, not a second office — work here is served out of our Farmington Hills headquarters and manufacturing plant. For the home market picture, see the Metro Detroit page, or the service areas hub for everywhere Maverick installs across Michigan, Ohio, and the Midwest.

  • Lansing
  • East Lansing
  • Okemos
  • Delta Township
  • Jackson

Lansing Questions, Answered Straight

Do you actually travel to Lansing, or is this just a listing page?

We travel. Maverick has one location — 23460 Industrial Park Dr in Farmington Hills — and no branch office, no rented yard, and no subcontracted local applicator in Lansing. When you award a mid-Michigan project, our own crews and the factory-batched material they install both mobilize from Farmington Hills for the duration of the work. Mobilization is scoped and quoted up front as part of the project, so there is no surprise line item at contract time. What does not change with distance is the spec: the same engineered build-up, the same manufactured material, the same 2-year single-source warranty covering materials and labor.

Which system fits a Lansing food processing plant?

Usually MavCrete urethane cement. In wet production and back-of-house areas it is placed seamless and coved, sloped to drain, and rated for thermal shock through 250°F washdown — which is what kills quarry tile grout and thin coatings in a dairy, bakery, or beverage line. Drier packaging and warehouse zones next door typically get a MavCoat epoxy body or a MavTop quartz broadcast instead, because paying for urethane cement where you do not need it is wasted budget. All of it is formulated to support food-safety compliance programs, and every layer is documented on the build-up recommendation you approve before we mobilize.

Can you work around a plant shutdown or a campus semester break?

Yes — for a travel market that scheduling is the whole plan, not an accommodation. Because our crews stage in for the duration rather than driving home each night, mid-Michigan work is well suited to a fixed window: a holiday shutdown, a summer break, a changeover weekend, or a series of overnights. Tell us the dates you cannot move, and phasing, cure schedules, and fast-cure MavSeal topcoats get engineered around them before anyone mobilizes. Send scope to [email protected] or call (313) 889-2526 and you will have an engineered recommendation within 48 hours.

Weighing a wet-process floor against a coating? Start with the urethane cement page, or browse real installs in the project gallery.

Scope Your Lansing Floor

Processing plant, production bay, dining hall, or maintenance garage — tell us the square footage, the traffic, the chemistry, and the window you have to work in. An engineered build-up recommendation and budget direction come back within 48 hours, from the company that manufactures the material and installs it.